
Back in late 2025, Rio Tinto staked every open mineral claim in the Minas sub-basin, where our project sits.1
Ours weren't available.
We at TruSilver Metals Corp. hold 100% of the Sturgis-Walton Silver Project in Hants County, Nova Scotia.
CBC reported Rio Tinto applying for nearly 5,000 claims across a large swath of Hants County. That's where we are.1
Seventy claims, three exploration licences, with no NSR, and a signed permit to drill.
What a company that size does with its own money is worth understanding.
The move
Staking is how a company gets in the door on a basin. It's cheap, it's fast, and it buys room to look before anyone has to commit to anything.
What it tells us is that a team with a global exploration budget ran this same basin through its own screens and decided the ground was worth holding.
A Rio Tinto spokesperson told CBC News the company is running an early-stage exploration program in Nova Scotia, with their focus being on identifying potential copper resources.1
Copper is what they went looking for.
Here's the whole fact, in two lines.
Rio Tinto took every open claim in this basin.1
Ours weren't open, because we got there first.

The province
The Walton Mine was historically one of the largest barite producers in Canada.It ran for the better part of forty years, and when it closed the ground around it went quiet.4
That's been changing.
In March 2024 the province published its Critical Minerals Strategy and took it to the PDAC convention in Toronto.5
Through 2025 Premier Tim Houston carried that pitch to investors himself, telling them Nova Scotia could be a reliable, ethical, sustainable source of the materials the world is short of. The province also launched NovaMINE, a single portal built to move mine permitting through faster.63
By December the CBC was reporting a jump in exploration licence applications across the province, and naming Hants County as one of the two hotspots.1
The Premier was back at PDAC in February. By June, mining was one of six sectors the province had put growth funding behind.78
A province doesn't hand you ore. It hands you permits, data, infrastructure, and neighbours with capital. Nova Scotia has just spent the last three years getting better at all four.
And the ground Walton sat on is still there.
Our silver
The Walton Mine sits nearly adjacent to our ground. Before it took on water in 1970, its mill feed ran between 350 and 933 grams of silver per tonne, and individual holes ran far higher: one cut 5,754 grams over 12.8 metres.49
For a mine nobody talks about anymore, that's a loud number.
In 2023 we drilled the same rock formation on our side of the line, and the core came back carrying silver and copper.3
The hole did what it was drilled to do. It proved the structural model.2
His own presentation calls it drill ready. That's what comes next.2

The metal
Silver set an all-time high above $120 an ounce in January.10
It's since come off that high.
As of July 28, 2026, silver was still trading well above its 2025 average. In 2025 it broke $50 an ounce for the first time since 1980.11
Here's what sits underneath the price: a glaring deficit. The world has used more silver than it produced for six years running.11
To cover the gap, it's been pulling metal out of storage. Roughly 762 million ounces of it since 2021.11
And most silver isn't mined on purpose.
Only about a quarter of world mine supply comes from mines built to produce silver. The rest turns up as a by-product of copper, lead and zinc.11
So when the price moves, supply mostly can't follow. You can't just ramp up a by-product.
In November 2025 the United States added silver to its critical minerals list.11
Meaningful new mine supply eventually has to come from ground nobody is producing from yet. Which brings us back to this basin.
The ground
Our oldest licence here was staked in 2018.12
That's six years before the province published its critical minerals strategy, and a full seven years before Rio Tinto arrived.
We didn't move in next to them. They moved in around us.1
Seventy claims across three exploration licences, about 1,120 hectares, held outright, with no NSR.12
Roughly 70 kilometres northwest of Halifax, with paved highway to within a short gravel run of the property.12
And we already hold a Crown land exploration permit that runs to March 2028, covering drilling at three locations.3
Phase 1 is expanded AMT geophysics and at least two follow-up drill holes.12
The copper
We drilled this ground in 2023, and the hole that tested our structural model came back carrying silver and copper.3
The upper zone, from 359 to 377 metres, ran 12.15 g/t silver over 10.5 metres, including 0.6 metres at 149 g/t, with 0.044% copper over 18 metres. The lower zone, from 502 to 552 metres, ran 48.8 g/t silver over 19 metres, with 0.091% copper over 50 metres, including 8 metres at 0.35%.2
Today, this is a silver story, and that's the right way to read it. We're not going to stand here and tell you we're a copper company.
We'd just note what the major in this basin came looking for, and we have it too.
The people
Peter Hancock is joining TruSilver as chairman. He led the commissioning and ramp-up of a US$7 billion mine, and he runs a listed nickel and cobalt producer today.1213
He is also a Nova Scotian.
The mine was Koniambo Nickel in New Caledonia, where he was President from 2011 to 2016. Since December 2025 he has been interim Chief Executive Officer of Sherritt International, and he has sat on its board since 2021.1213
He took his engineering degrees at the Technical University of Nova Scotia, he is based in Halifax, and earlier in his career he ran the Brunswick Smelter in Belledune and led technology and business development for Noranda Zinc.121413
Across more than thirty years in mining, most of it with Glencore, he managed the Murrin Murrin nickel-cobalt operations in Western Australia. He sits on the board of Sibanye Stillwater today.12
Matt Rees joined in September 2026 as Vice-President, Exploration and a director, replacing co-founder Jim Michaelis, who stays on as Strategic Technical Advisor. Rees was Chief Geologist at IAMGOLD from 2018 to 2023, part of the team that discovered or acquired roughly 29 million ounces of gold, including the Nelligan discovery in Quebec. Before that, seventeen years at Noranda-Falconbridge.15
Penny White and William White co-founded Tiger Gold. Rick Huang was its CFO when it went public on the TSX Venture Exchange through a qualifying transaction.2
They're doing it again here.
At listing, 25,214,848 of our shares sit under escrow or voluntary three-year restrictions, and another 5,106,840 carry other trading restrictions.16
That leaves a public float of 12,222,990 shares out of 42,544,678 outstanding. Insiders hold 39%.16
The financing closed in September 2026 at C$2,510,090, and about C$305,000 of it was our directors and CFO buying alongside everyone else.15
We'll leave you with this thought. The door on this basin closed in late 2025, and we'd been holding our ground for seven years before it did.
Now you're at the beginning of our story, and how you handle that timing is up to you.
Follow the discovery
There are also two other important ways to view our overall story.
We respect your privacy. No unsolicited communications.
TruSilver Metals Corp. owns 100% of the Sturgis-Walton Silver Project in Hants County, Nova Scotia, about 70 kilometres northwest of Halifax. Seventy claims across three exploration licences, about 1,120 hectares, with no NSR.
A deep target southwest of the historic Walton Mine, identified by magnetic, gravity and AMT surveys. The working interpretation is that the historic mine worked a higher-level branch of a mineral system whose main feeder sits deeper and to the southwest. No drill has tested it at depth.
Yes. In 2023, hole ST-23-01 cut mineralization in the Macumber Formation, the same host unit the Walton Mine produced from, south of the historic workings, on ground TruSilver holds.
Yes. A Crown land exploration permit valid to March 4, 2028 authorizes drilling at three locations, plus access trails and 4.3 kilometres of line cutting.
No. TruSilver Metals Corp. does not own the Walton Mine. The historic mine and its workings sit on exploration licences held by other companies, immediately north and west of the Project. What TruSilver holds is the ground the same host formation runs onto.
The carbonate replacement deposit classification is analogous to Irish-Type, after the belt in Ireland that hosts them. Metal-bearing brine rises along faults, replaces a reactive carbonate bed, and concentrates where conditions change. The host unit at Walton and on TruSilver's ground is the Macumber Formation.
Pre-listing: through TruSilver's investor list and IR contact.
| # | Carries | Source |
|---|---|---|
| 1 | Rio Tinto applying for nearly 5,000 claims across Hants County, the copper quote, and the 2025 jump in exploration licence applications | Grant, T., Prospectors rushed to Nova Scotia in 2025 in response to Houston's welcome. CBC News, December 16, 2025. |
| 2 | Escrowed and restricted shares, the Tiger Gold roles, the trunk and branch interpretation, the 2023 intercepts, and the drill-ready programme | TruSilver Metals Corp. corporate presentation. |
| 3 | NovaMINE permitting portal, the permit and its three locations | Government of Nova Scotia, New Mine Permitting Portal Launches, October 14, 2025; and TruSilver Metals Corp., Project Overview. |
| 4 | Walton historic grades and the 1970 flooding | Mills, R., O'Reilly, G. and Donohoe, H., Selected Economic Mineral Deposits of the Walton Belt, Hants County. NSDNR Open File Report 2003-1. |
| 5 | Critical Minerals Strategy, March 2024 | Government of Nova Scotia, Nova Scotia Launches Critical Minerals Strategy, March 4, 2024. |
| 6 | Premier at PDAC 2025 | Government of Nova Scotia, Nova Scotia Advancing Critical Mineral Opportunities, March 4, 2025. |
| 7 | Premier at PDAC 2026 | Government of Nova Scotia, Premier Promotes Critical Minerals Opportunities to Developers, Investors, February 27, 2026. |
| 8 | Mining roundtable, priority sector, growth funding | Government of Nova Scotia, Roundtable Launched to Guide Mining Industry Opportunities, June 4, 2026. |
| 9 | Historic intercepts at Walton including DDH 174 | Patterson, J.W. (1988), NSDNR Open File Reports ME 1988-045 and 88-21. Historic, unverified by a Qualified Person. |
| 10 | All-time high above $121 on January 29, 2026 | The Silver Institute and Metals Focus, April 15, 2026. |
| 11 | 2025 annual average of $40.03, silver breaching $50 for the first time since 1980, the sixth consecutive annual deficit, 762.1 Moz drawn from above-ground stocks since 2021, primary silver mines at 26% of mine supply, and the US critical minerals designation | World Silver Survey 2026, The Silver Institute and Metals Focus, April 15, 2026. |
| 12 | Ownership, claims, hectares, location, Hancock's career, the Phase 1 programme and the About TruSilver boilerplate | Galaxy Ventures Inc., Enters Into Definitive Agreement with TruSilver Metals Corp., June 1, 2026. |
| 13 | Hancock as interim Chief Executive Officer of Sherritt International since December 2025, a director since 2021, based in Halifax, educated at the Technical University of Nova Scotia | Sherritt International Corporation, Leadership Transition, December 8, 2025. |
| 14 | The Brunswick Smelter location in Belledune, New Brunswick | Glencore Canada Corporation, Glencore Announces Permanent Closure of Brunswick Smelter Facility, November 13, 2019. |
| 15 | Matt Rees appointment and background, Michaelis’s advisory role, the closed C$2,510,090 financing and related-party participation | Galaxy Ventures Inc., Announces Major Milestones for Qualifying Transaction: TruSilver Completes $2.5 Million Financing and Appoints Former IAMGOLD Chief Geologist Matt Rees as Director and Vice-President of Exploration, September 15, 2026. trusilvermetals.com/news-releases |
| 16 | Resulting-issuer capital structure at listing (escrow and restrictions, public float, shares outstanding, options, warrants, fully diluted), market capitalization, cash at listing, insider ownership, fall 2026 drilling program | TruSilver Metals Corp., Fact Sheet, September 2026 (Metals Forum print edition, reviewed and approved by Matt Rees, P.Geo.). trusilvermetals.com |
Qualified Person: Jeff Burke, P.Geo., a Qualified Person as defined by National Instrument 43-101, has reviewed and approved the scientific and technical information in this web page. Mr. Burke is an employee of the Company and is not independent to the Company.
Mr. Burke has reviewed the available geological, geophysical and drilling information relating to the Sturgis-Walton Silver Project, including the geological records, drill logs, assay information, survey results and quality assurance and quality control information supporting the current exploration information disclosed on this webpage.
Information concerning the historic Walton Mine, including its historical production, drilling and assay results, has been obtained from the historical sources identified on this webpage. The Walton Mine is located on mineral licences that TruSilver does not own and is adjacent to the Sturgis-Walton Silver Project.
Mr. Burke has not independently verified the historical Walton Mine results. Certain original records, samples and drill core, including the core from DDH 174, may no longer be available for verification or re-sampling. Historic silver grade of 5,754 g/t Ag is derived from the reported 185 oz/ton Ag over 42 feet, converted to metric/modern being 5,754 g/tonne over 12.8 m in DDH 174. These historical results have not been verified by a Qualified Person, core for certain holes (including DDH 174) is incomplete and cannot be re-sampled, and should not be relied upon without further drilling and QA/QC confirmation. The historical results should not be relied upon without further confirmation and are not necessarily indicative of mineralization that may be present on the Sturgis-Walton Silver Project.
Historical results are derived principally from Patterson, J.W. (1988), Walton Mine: Underground Drill Hole & Assay Data, Nova Scotia Department of Mines and Energy, Open File Report ME 1988-045; Patterson, J.W. (1988), Exploration Potential for Argentiferous Base Metals at the Walton Deposit, Open File Report 88-21; and Mills, R., O’Reilly, G. and Donohoe, H., Selected Economic Mineral Deposits of the Walton Belt, Hants County, Nova Scotia Department of Natural Resources Open File Report 2003-1.
This webpage contains forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking information includes statements concerning TruSilver’s exploration plans, proposed drilling and geophysical programs, geological interpretations, exploration targets, the possible continuation or geometry of mineralized structures, the branch-and-trunk exploration model, the potential relationship between the Sturgis-Walton Silver Project and the historic Walton Mine, and the possibility of discovering mineralization.
Forward-looking information is based on management’s current expectations, estimates, assumptions and interpretations, including assumptions concerning the availability of financing and personnel, receipt and continued effectiveness of permits, access to the Project, contractor and equipment availability, geological continuity, interpretation of historical and current exploration information, and the timely completion of planned exploration activities.
Forward-looking information involves known and unknown risks, uncertainties and other factors that may cause actual results to differ materially from those expressed or implied. These factors include exploration and drilling risks, geological uncertainty, the speculative nature of mineral exploration, the possibility that geological interpretations or exploration models may prove incorrect, the possibility that drilling will not intersect significant mineralization, permitting and environmental risks, availability of financing, commodity-price fluctuations, operating and contractor risks, and other risks associated with mineral exploration. There is no assurance that planned exploration will be completed as proposed or that it will result in the discovery or definition of a mineral resource.
The comparisons to the historic Walton Mine, Irish-Type deposits and other mineral districts are provided solely for geological context. They are not forecasts, projections or indications that mineralization of similar grade, size, continuity or economic significance exists or will be discovered on the Sturgis-Walton Silver Project. No mineral resource or mineral reserve has been defined on the Project, and there is no assurance that further exploration will result in one being defined.
Readers should not place undue reliance on forward-looking information. Forward-looking information is provided as of the date of this webpage, and TruSilver disclaims any intention or obligation to update it except as required by applicable securities laws.
Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.
Not for distribution to United States newswire services or dissemination in the United States. The securities described have not been registered under the U.S. Securities Act of 1933 and may not be offered or sold in the United States absent registration or an applicable exemption.
One email when the assays land. Nothing else.
Thank you. The assays will come to you when they’re public.
We respect your privacy. No unsolicited communications.